Q:When routing the cable through the inner and outer baskets,what should a technician ensure?
Ans:There is proper slack for the extension of the cable management assembly arm.
Q:Which of the following components is not part of the cable management arm(CMA) kit?
Ans:Cable management arm cover.
Q:What is the first step taken when installing the cable management arm tray?
Ans:Align the tray with the receiver brackets on the inner edges of the rails.
Q:The status indicator cable connects to the system next to which port?
Ans:iDRAC Port.
Q:The cable management arm must be installed on either the left or the right depending on the cable routing from the system.
Ans:True.
No comments:
Post a Comment